PROJECT ENERGY REDUCTION
OP PIK Energy Savings V. Challenge
Project number: CZ.01.3.10/0.0/0.0/19_251/0019450
Reducing the energy consumption of the production process at Lasspektrum s.r.o.
The main goal of the submitted project is to reduce the energy consumption of the production process at Lasspektrum s.r.o., thanks to the implementation of energy measures related to reducing energy consumption/increasing the energy efficiency of production and technological processes, where the energy-intensive welding machine technology will be replaced in the metal production.
The project is co-financed by the European Union.
STRENGTHENING COMPETITIVENESS IN THE FIELD OF DIGITALISATION AND AUTOMATION
OP PIK Technology X. Challange
Project Number: CZ.01.2.06/0.0/0.0/19_250/0019195
Strengthening the competitiveness of Lasspektrum s.r.o. in the field of digitalization and automation
The main goal of the submitted project is to strengthen the automation and digital transformation of Lasspektrum s.r.o. and increase its competitiveness in the market. The project's goal will be achieved by acquiring new highly modern technological equipment with top technical and utility parameters. The specialised equipment will significantly increase the production technological maturity of our company and will comprehensively connect the data structure of Lasspektrum s.r.o.
The project is co-financed by the European Union.
FURTHER REDUCING ENERGY CONSUMPTION II
OP PIK Energy Savings VI. Challenge
Project number: CZ.01.3.10/0.0/0.0/20_370/0025293
Implementation of a cost-saving technological measure in Lasspektrum s.r.o.
The main goal of the submitted project is to reduce the overall energy consumption of operations and, consequently, the production process of Lasspektrum s.r.o., thanks to the implementation of energy measures related to reducing energy consumption / increasing the energy efficiency of production and technological processes, when 2 energy-intensive tumbling machines will be replaced by a new energy-less demanding tumbling line in the metal production.
The project is co-financed by the European Union.
FURTHER REDUCING THE ENERGY CONSUMPTION OF THE PRODUCTION PROCESS
OP PIK Energy Savings V. Challenge
Project number: CZ.01.3.10/0.0/0.0/19_251/0022284
Further reduction of energy consumption in the production process at Lasspektrum s.r.o.
The main goal of the submitted project is to reduce the energy consumption of the production process of Lasspektrum s.r.o., thanks to the implementation of energy measures related to reducing energy consumption/increasing the energy efficiency of production and technological processes, when 2 energy-intensive surface treatment technologies will be replaced by the process of deburring and grinding metal workpieces in metal production.
The project is co-financed by the European Union.
SET OF ENERGY MEASURES AT LASSPEKTRUM S.R.O.
OP PIK Energy Savings VI. Challenge
Project number: CZ.01.3.10/0.0/0.0/20_370/0023981
Set of energy measures in Lasspektrum s.r.o.
The main goal of the submitted project is to reduce the overall energy consumption of the operation and consequently the production process of Lasspektrum s.r.o. Through the implementation of energy measures related to reducing energy consumption/increasing the energy efficiency of production and technological processes, replacing energy-intensive welding machine technology with a new energy-saving welding machine with robot and replacing 3 energy-intensive machine tools (universal milling machine, centre lathe and pillar drill) with 1 new energy-saving CNC turning and milling centre, in the metal production and thanks to the implementation of RES installation measures for the company's consumption, where PV without accumulation will be installed for the company's use.
The project is co-financed by the European Union.
CONSTRUCTION OF A NEW PRODUCTION FACILITY
OP PIK Real Estate III. Challenge
Project number: CZ.01.2.07/0.0/0.0/18_238/0014784
Reconstruction and extension of the new operational area of Lasspektrum s.r.o.
The main goal of the project is to build a new operational space for Lasspektrum s.r.o., where the project will include the reconstruction of existing buildings with a predominantly brownfield type, which are currently in an unsuitable construction-technical condition and cannot be thoroughly and efficiently used, and their extension, which will create a new operational facility consisting of new production and administrative capacities.
The project is co-financed by the European Union.
OP TAK ENERGY SAVINGS I. CHALLENGE
Project number: CZ.01.04.01/01/22_006/0001456
Reducing the energy consumption of the production process at Lasspektrum s.r.o.
The main goal of the submitted project is to reduce the overall energy consumption of the company's existing operation and consequently the production process related to sheet metal straightening within the company's metal production activities through the implementation of energy-saving measures related to reducing energy consumption/increasing energy efficiency of production and technological processes, replacing 1 piece of the existing energy-intensive hydraulic press for sheet metal straightening with 1 piece of new sheet metal straightening equipment, less energy-intensive, as well as thanks to the implementation of a measure consisting in the use of RES in the form of the installation of a PV plant without accumulation with an expected output of 49.95 kWp to cover a further partial part of the company's energy consumption.
The project is co-financed by the European Union.